Sequenced to your builder

Knock Down Rebuild on the Central Coast

Replacing an old fibro weekender or a tired hillside house with a new home is common on the Coast. The demolition has to land exactly when the builder is ready — and the Coast's controls add steps.

Call 02 5024 3718 Get a price

Licence and insurance details are provided on your discovery call, or whenever you ask. Request them →

Why the Coast is knock-down-rebuild country

Coastal land values have risen far faster than the value of the old houses sitting on it. Thousands of 1950s–70s weekenders and modest brick homes now occupy blocks where a new family home makes more sense than another renovation.

The sequence

1. Feasibility. Planning certificate for the lot — bushfire, flood, coastal and heritage matters — survey, trees and asbestos likelihood.

2. Design and builder. The builder's contract should include written site requirements: what must be removed and the condition the block is handed over in.

3. Approval. Complying development through a certifier, or a development application to Central Coast Council. Bushfire and flood matters are resolved here. Demolition is often included in the same approval.

4. Demolition price. From an inspection, matched to the builder's site requirements.

5. Disconnections. Start the day approval is issued: electricity via the network operator, gas, and water and sewer with Central Coast Council.

6. Move out.

7. Asbestos. Survey, licensed removal, clearance. On fibro houses, allow for it to be substantial. See asbestos removal.

8. Demolition and sorted disposal.

9. Handover to the builder.

What builders usually want gone

  • House, slab, footings and piers.
  • Old paths, driveway and crossover where the design moves them.
  • Pools — see pool removal.
  • Retaining walls in the new footprint.
  • Trees within the building envelope, where approved.
  • Fill that will not support the new footings.

Hillside blocks

On Terrigal, Wamberal and Avoca hillsides, the builder's excavation plan often dictates how much of the old retaining, rock and footings has to come out during demolition. Getting the two scopes aligned saves paying for the same rock twice.

Where it happens

Especially across Terrigal and Wamberal, the Woy Woy Peninsula, Erina, The Entrance and Gosford.

Costs

See the 2026 cost bands.

Call 02 5024 3718 or send the job details through.

Other demolition services

  1. House DemolitionFibro shacks to double-brick homes — approvals checked, services disconnected, structure down and the block handed back clear.
  2. Asbestos RemovalAsbestos surveys and removal arranged through separately licensed removalists — sequenced before demolition, with clearance.
  3. Pool RemovalConcrete and fibreglass pools broken out or removed and backfilled, with compaction suited to what goes on top.
  4. Strip OutsShops, offices and homes stripped back to the structure — fit-outs, ceilings, partitions and services removed ready for the next build.
  5. Garage & Shed RemovalFibro garages, boatsheds, carports and outbuildings taken down — tested for asbestos first.
  6. Concrete RemovalDriveways, slabs and footings broken out and carted, including steep driveways on hillside blocks.
  7. Site ClearingBlocks cleared for building — structures, rubbish and approved vegetation removed, with bushfire and erosion requirements met.
FAQs

Questions people ask before they commit

Does bushfire affect a knock-down-rebuild?

On bushfire prone land, the new home usually needs a bushfire assessment and must be built to the relevant construction standard for its bushfire attack level. That is set during design and approval. It can also affect which trees are retained and how the site is managed.

What about flood-affected lots near Brisbane Water or the lakes?

Low-lying lots may have minimum floor levels or other flood-related requirements for the new house, set through the approval. That affects design and sometimes fill, but the demolition sequence stays the same — the approval simply needs to be in place first.

Should I move out before approval?

No. Keep living in the house until the approval is issued and disconnections and demolition are booked. Moving out early costs rent while nothing can legally happen.

How long between moving out and the builder starting?

Typically four to eight weeks for disconnections, asbestos removal and demolition on a standard house, once approval is in hand. Heavy asbestos, steep sites or difficult access extend it.

Free, no-obligation

Get your free quote today

Get a Price on Your Demolition

CC Demolition Call 02 5024 3718 Free measure & quote
Call 02 5024 3718